Thomson line underground mass rapid transit station at Woodlands Square

Project Year:2016

Project Duration:9th September 2016 - Present

Client:Stelatex (Holding) Pte Ltd

Services Provided:Civil and Structural engineering

This project involve all design of temporary structures and checking of permanent structures during construction sequence of the proposed transit station. The temporary structures include hoarding, working platform, support, bracing, steel member connection, and prop whereas the checking of permanent structures include the long-span truss during lifting, existing RC slab taking outrigger force by lorry crane, etc.