Periodic Building Inspection at Costa Rhu Condominium at 7 Rhu Cross Singapore 437435

Project Year:2016

Project Duration:3rd November 2016 - 5th December 2016

Client:The Management Corporation Strata Title Plan No. 2345/ Innovez Engineering Pte Ltd

Services Provided:Carry Out visual inspection to identify the building defects and provide method statement for the defects repair works

The Project involves the periodic building inspection and rectification work to establish the stage of structural deterioration and recommended appropriate repair to the swimming pool structure due to water seepage defect at Costa Rhu Condominium at 7 Rhu Cross, Singapore 437435