30 ton lifting platform for heavy equipment

Project Year:2016

Project Duration:2016 - 2017

Client:Sin Chew Woodpaq Pte Ltd

Services Provided:Civil and Structural Engineering

The Project involves the design of steel platform measuring 8m x 3.6m , for design load of 30 ton and it is used for the transfer of heavy equipment.